
Inside Putian manufacturing
A Defined Modular Building Manufacturing Workflow
Each order moves from requirement and drawing confirmation through production checkpoints, finishing, packing preparation and loading records.
Request factory information Production reference visual. Confirm current factory evidence with our team.Order path
Seven Stages from Brief to Loading Record
The exact inspection points and documents depend on the product system, confirmed material list, order requirements and destination.
- 01Requirement and drawing confirmationApplication, layout, destination, configuration and revision.
- 02Incoming material reviewIdentification, dimensions, appearance and applicable documents.
- 03Steel processingOrder-linked preparation of structural members and components.
- 04Frame weldingGeometry, connections and visible workmanship checkpoints.
- 05Module assemblyPanels, doors, windows and order-specific installed components.
- 06Finishing and final reviewConfiguration, appearance, accessories and quantity checks.
- 07Packing and loading recordPacking marks, component list and available loading evidence.
Factory workflow
Production Stage References
These visuals explain the workflow. Current order-specific evidence can be provided during supplier review.






Document scope
Quality Records Must Match the Exact Order
Inspection instructions, completed reports, drawings, specifications, packing lists and loading records are not interchangeable. Buyers should check the product or order reference, revision, date, issuer and stated scope before using any document as evidence.
Review the quality-control approachFactory review
Connect your checklist to the order stage.
Tell us the product, quantity, destination and supplier-qualification information required.